• Latest News

    News

Timing and Innovative Design; The Key


24 Apr, 2013 - 11:01PM 442

GLP Engineering were contacted by Santos to design and build a new liquid distributor tray for a regenerator tower. GLP were asked to fabricate a brand new distributor within a 14 day period. With information available, GLP drafted new tray drawings and in-turn, created the required fabrication drawings to finish the task accurately and on-time. The ability to respond quickly and effectively in any situation is what makes GLP Engineering an industry leader.

Your email will not be displayed
Favourites
Your favourites list is empty