<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>GLP</title>
	<atom:link href="http://www.glp.com.au/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.glp.com.au</link>
	<description>Gas Liquid Processing</description>
	<lastBuildDate>Thu, 13 May 2010 06:37:05 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Last Piece of the Puzzle for Tassie LNG</title>
		<link>http://www.glp.com.au/2010/01/07/last-piece-of-the-puzzle-for-tassie-lng/</link>
		<comments>http://www.glp.com.au/2010/01/07/last-piece-of-the-puzzle-for-tassie-lng/#comments</comments>
		<pubDate>Thu, 07 Jan 2010 02:41:17 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=85</guid>
		<description><![CDATA[GLP to design, build Micro-LNG plant &#38; pipeline in Tasmania.
GLP Plant has been awarded the contract by Tas Gas Networks to design and build the gas supply pipeline infrastructure between the Tasmanian Gas Pipeline (TGP) and the BOC Micro-LNG Plant being built at Westbury in Tasmania.
The BOC Micro-LNG Plant will have the capacity to provide...]]></description>
			<content:encoded><![CDATA[<p>GLP to design, build Micro-LNG plant &amp; pipeline in Tasmania.</p>
<p>GLP Plant has been awarded the contract by Tas Gas Networks to design and build the gas supply pipeline infrastructure between the Tasmanian Gas Pipeline (TGP) and the BOC Micro-LNG Plant being built at Westbury in Tasmania.</p>
<p>The BOC Micro-LNG Plant will have the capacity to provide 50 tonnes per day of LNG (Liquefied Natural Gas) to the heavy transport sector. This is the equivalent of 70,000 litres a day of conventional diesel, and is also being designed, built and commissioned by GLP Plant.</p>
<p>Peter Ramsey, Managing Director of GLP Plant said, &#8220;We are proud to have been selected by Tas Gas Networks for this work. It validates the time and effort we have invested in building world-class expertise in the small LNG plant market.&#8221;</p>
<p>The plant is expected to be fully operational mid 2010.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2010/01/07/last-piece-of-the-puzzle-for-tassie-lng/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP &#8220;All Systems GO&#8221; for Westbury LNG</title>
		<link>http://www.glp.com.au/2009/08/21/glp-all-systems-go-for-westbury-lng/</link>
		<comments>http://www.glp.com.au/2009/08/21/glp-all-systems-go-for-westbury-lng/#comments</comments>
		<pubDate>Fri, 21 Aug 2009 02:40:42 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=83</guid>
		<description><![CDATA[All systems are now GO on the 50 tonne/day Micro-LNG Plant. GLP’s Managing Director Peter Basil Ramsey attended the recent ‘ground–breaking ceremony’ at the site in Westbury, Tasmania.
The GLP Group was selected after undergoing an approval process of more than 12 months demonstrating its high level of engineering excellence in innovative design and construction in...]]></description>
			<content:encoded><![CDATA[<p><a  href="http://www.glp.com.au/wp-content/uploads/boc_westbury.jpg" class="thickbox no_icon" rel="gallery-83" title="boc_westbury"><img class="alignleft size-thumbnail wp-image-104" title="boc_westbury" src="http://www.glp.com.au/wp-content/uploads/boc_westbury-150x150.jpg" alt="" width="120" height="120" /></a>All systems are now GO on the 50 tonne/day Micro-LNG Plant. GLP’s Managing Director Peter Basil Ramsey attended the recent ‘ground–breaking ceremony’ at the site in Westbury, Tasmania.</p>
<p>The GLP Group was selected after undergoing an approval process of more than 12 months demonstrating its high level of engineering excellence in innovative design and construction in modular style plants.</p>
<p>This Micro–LNG Plant involves the combination of technologies from both Linde–BOC and GLP which will produce the equivalent of 70,000 litres of Liquid Natural Gas as a cleaner, more economical fuel alternative for the heavy transport industry in Tasmania.</p>
<p>With final design, hazops and procurement of major equipment now complete, work on site will soon progress.</p>
<p><a  href="http://www.glp.com.au/wp-content/uploads/GLP-News-Release-2009-08-21-GLP-All-Systems-GO-for-Westbury-LNG.pdf">GLP &#8211; News Release 2009-08-21 &#8211; GLP All Systems GO for Westbury LNG</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2009/08/21/glp-all-systems-go-for-westbury-lng/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP to design, construct infrastructure for BOC LNG in Tasmania</title>
		<link>http://www.glp.com.au/2009/07/23/glp-to-design-construct-infrastructure-for-boc-lng-in-tasmania/</link>
		<comments>http://www.glp.com.au/2009/07/23/glp-to-design-construct-infrastructure-for-boc-lng-in-tasmania/#comments</comments>
		<pubDate>Thu, 23 Jul 2009 02:40:12 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=81</guid>
		<description><![CDATA[GLP Group has been contracted by BOC to design and construct the supply chain infrastructure, including road tankers and six refuelling stations, for a micro-LNG (Liquefied Natural Gas) plant in Westbury, Tasmania.
Construction on-site will begin in either late September or early October 2009.
A 25-30 metre offtake from the Tasmania Gas Pipeline will be included in...]]></description>
			<content:encoded><![CDATA[<p><a  rel="attachment wp-att-108" href="http://www.glp.com.au/2009/07/23/glp-to-design-construct-infrastructure-for-boc-lng-in-tasmania/co2-plant/"><img class="alignleft size-thumbnail wp-image-108" title="co2-plant" src="http://www.glp.com.au/wp-content/uploads/co2-plant-120x120.jpg" alt="" width="120" height="120" /></a>GLP Group has been contracted by BOC to design and construct the supply chain infrastructure, including road tankers and six refuelling stations, for a micro-LNG (Liquefied Natural Gas) plant in Westbury, Tasmania.</p>
<p>Construction on-site will begin in either late September or early October 2009.</p>
<p>A 25-30 metre offtake from the Tasmania Gas Pipeline will be included in the micro-LNG plant, which will process the gas and store LNG at the facility. LNG will be distributed throughout Tasmania to fuel the transportation industry.</p>
<p>The LNG plant will have the capacity to produce 50 t/d (the equivalent of 70,000 litres of conventional diesel).</p>
<p>The plant is expected to come online in late May or early June 2010.</p>
<p><a  href="http://www.glp.com.au/wp-content/uploads/GLP-News-Release-2009-07-23-GLP-to-design-construct-infrastructure-for-BOC-LNG-in-Tasmania.pdf">GLP &#8211; News Release 2009-07-23 &#8211; GLP to design, construct infrastructure for BOC LNG in Tasmania</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2009/07/23/glp-to-design-construct-infrastructure-for-boc-lng-in-tasmania/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP to supply separation, liquefaction to Callide Oxyfuel</title>
		<link>http://www.glp.com.au/2008/10/24/glp-to-supply-separation-liquefaction-to-callide-oxyfuel/</link>
		<comments>http://www.glp.com.au/2008/10/24/glp-to-supply-separation-liquefaction-to-callide-oxyfuel/#comments</comments>
		<pubDate>Fri, 24 Oct 2008 02:39:45 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=79</guid>
		<description><![CDATA[GLP Plant Pty Ltd has signed a contract with Callide Oxyfuel Services Pty Ltd (COSPL), a consortium of companies, to supply CO2 liquefaction and air separation plants.
The objective of the COSPL project is to demonstrate a complete and integrated process of oxyfuel combustion within a National Electricity Market. The plant is a demonstration of greenhouse...]]></description>
			<content:encoded><![CDATA[<p>GLP Plant Pty Ltd has signed a contract with Callide Oxyfuel Services Pty Ltd (COSPL), a consortium of companies, to supply CO2 liquefaction and air separation plants.</p>
<p>The objective of the COSPL project is to demonstrate a complete and integrated process of oxyfuel combustion within a National Electricity Market. The plant is a demonstration of greenhouse gas elimination and clean fuel technology. The old Callide A power station near Gladstone in Queensland, AUSTRALIA is being refurbished for this purpose.</p>
<p>GLP will complete assembly of two air separation plants, total Oxygen separation capacity 660 tonne/day, supplied from France including design and installation of civil, tie-in piping and electrical work.</p>
<p>GLP will also design and erect a 100 tonne/day CO2 liquefaction plant to enable liquid geosequestration &#8211; safe long-term underground storage of liquid CO2 in spent oil and gas wells and coal seams.</p>
<p>Project scheduled for completion February 2011.</p>
<p><a  href="http://www.glp.com.au/wp-content/uploads/GLP-News-Release-2008-10-24-GLP-to-supply-separation-liquefaction-to-Callide-Oxyfuel.pdf">GLP &#8211; News Release 2008-10-24 &#8211; GLP to supply separation, liquefaction to Callide Oxyfuel</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2008/10/24/glp-to-supply-separation-liquefaction-to-callide-oxyfuel/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP celebrates 10 Years</title>
		<link>http://www.glp.com.au/2008/05/02/glp-celebrates-10-years/</link>
		<comments>http://www.glp.com.au/2008/05/02/glp-celebrates-10-years/#comments</comments>
		<pubDate>Fri, 02 May 2008 02:39:18 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=77</guid>
		<description><![CDATA[
GLP is an Australian owned and operated company proudly celebrating 10 years in business.
]]></description>
			<content:encoded><![CDATA[<p style="text-align: center;"><a  href="http://www.glp.com.au/wp-content/uploads/img_news001.png" class="thickbox no_icon" rel="gallery-77" title="img_news001"><img class="size-full wp-image-129  aligncenter" title="img_news001" src="http://www.glp.com.au/wp-content/uploads/img_news001.png" alt="" width="317" height="115" /></a></p>
<p>GLP is an Australian owned and operated company proudly celebrating 10 years in business.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2008/05/02/glp-celebrates-10-years/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP to supply Biogas Conditioning Package</title>
		<link>http://www.glp.com.au/2007/01/11/glp-to-supply-biogas-conditioning-package/</link>
		<comments>http://www.glp.com.au/2007/01/11/glp-to-supply-biogas-conditioning-package/#comments</comments>
		<pubDate>Thu, 11 Jan 2007 02:39:02 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=75</guid>
		<description><![CDATA[GLP has designed &#38; supplied a Biogas Conditioning Package to Sydney Water for the North Head Sewerage Treatment Plant in Sydney. Delivered January 2007.
]]></description>
			<content:encoded><![CDATA[<p><a  href="http://www.glp.com.au/wp-content/uploads/img_photo044.jpg" class="thickbox no_icon" rel="gallery-75" title="img_photo044"><img class="alignleft size-thumbnail wp-image-131" title="img_photo044" src="http://www.glp.com.au/wp-content/uploads/img_photo044-120x120.jpg" alt="" width="120" height="120" /></a>GLP has designed &amp; supplied a Biogas Conditioning Package to Sydney Water for the North Head Sewerage Treatment Plant in Sydney. Delivered January 2007.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2007/01/11/glp-to-supply-biogas-conditioning-package/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New Technology for Recovery of CO2 from Flu Gas</title>
		<link>http://www.glp.com.au/2006/12/11/new-technology-for-recovery-of-co2-from-flu-gas/</link>
		<comments>http://www.glp.com.au/2006/12/11/new-technology-for-recovery-of-co2-from-flu-gas/#comments</comments>
		<pubDate>Mon, 11 Dec 2006 02:38:25 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=71</guid>
		<description><![CDATA[GLP installed a 150 t/day CO2Recovery Plant for economic recovery of CO2 from flu gasses. Completed December 2006.
]]></description>
			<content:encoded><![CDATA[<p><a  href="http://www.glp.com.au/wp-content/uploads/img_photo046.jpg" class="thickbox no_icon" rel="gallery-71" title="img_photo046"><img class="alignleft size-thumbnail wp-image-136" title="img_photo046" src="http://www.glp.com.au/wp-content/uploads/img_photo046-120x120.jpg" alt="" width="120" height="120" /></a>GLP installed a 150 t/day CO<sub>2</sub>Recovery Plant for economic recovery of CO<sub>2</sub> from flu gasses. Completed December 2006.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2006/12/11/new-technology-for-recovery-of-co2-from-flu-gas/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ammonia Unload Facility Commisioned at BHP Billiton Yabulu Refinery</title>
		<link>http://www.glp.com.au/2006/11/11/ammonia-unload-facility-commisioned-at-bhp-billiton-yabulu-refinery/</link>
		<comments>http://www.glp.com.au/2006/11/11/ammonia-unload-facility-commisioned-at-bhp-billiton-yabulu-refinery/#comments</comments>
		<pubDate>Sat, 11 Nov 2006 02:38:44 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=73</guid>
		<description><![CDATA[GLP has supplied a 16 t/hr Ammonia Unload Facility to BHP Billiton Yabulu Refinery. Completed November 2006.
]]></description>
			<content:encoded><![CDATA[<p><a  href="http://www.glp.com.au/wp-content/uploads/img_photo045.jpg" class="thickbox no_icon" rel="gallery-73" title="img_photo045"><img class="alignleft size-thumbnail wp-image-134" title="img_photo045" src="http://www.glp.com.au/wp-content/uploads/img_photo045-120x120.jpg" alt="" width="120" height="120" /></a>GLP has supplied a 16 t/hr Ammonia Unload Facility to BHP Billiton Yabulu Refinery. Completed November 2006.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2006/11/11/ammonia-unload-facility-commisioned-at-bhp-billiton-yabulu-refinery/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Water Management Still Installed at BHP Billiton Yabulu Nickel Refinery</title>
		<link>http://www.glp.com.au/2006/01/12/water-management-still-installed-at-bhp-billiton-yabulu-nickel-refinery/</link>
		<comments>http://www.glp.com.au/2006/01/12/water-management-still-installed-at-bhp-billiton-yabulu-nickel-refinery/#comments</comments>
		<pubDate>Thu, 12 Jan 2006 02:37:45 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=67</guid>
		<description><![CDATA[GLP completed delivery of a new Water Management Still to BHP Billiton for the Yabulu Refinery Extension Project north of Townsville. The Column was delivered and erected in January, 2006.
]]></description>
			<content:encoded><![CDATA[<p><a  href="http://www.glp.com.au/wp-content/uploads/img_photo021.jpg" class="thickbox no_icon" rel="gallery-67" title="img_photo021"><img class="alignleft size-thumbnail wp-image-139" title="img_photo021" src="http://www.glp.com.au/wp-content/uploads/img_photo021-120x120.jpg" alt="" width="120" height="120" /></a>GLP completed delivery of a new Water Management Still to BHP Billiton for the Yabulu Refinery Extension Project north of Townsville. The Column was delivered and erected in January, 2006.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2006/01/12/water-management-still-installed-at-bhp-billiton-yabulu-nickel-refinery/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GLP Commissions Distributor Test Rig</title>
		<link>http://www.glp.com.au/2006/01/11/glp-commissions-distributor-test-rig/</link>
		<comments>http://www.glp.com.au/2006/01/11/glp-commissions-distributor-test-rig/#comments</comments>
		<pubDate>Wed, 11 Jan 2006 02:38:07 +0000</pubDate>
		<dc:creator>GLP Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.glp.com.au/?p=69</guid>
		<description><![CDATA[GLP now has installed at our Tullamarine workshops a test rig for flow testing of high technology distributors and internals. The rig is designed for testing of internals up to 2100mm in diameter with the ability to retrofit capture hoods suitable for testing up to 4000mm in diameter.
]]></description>
			<content:encoded><![CDATA[<p>GLP now has installed at our Tullamarine workshops a test rig for flow testing of high technology distributors and internals. The rig is designed for testing of internals up to 2100mm in diameter with the ability to retrofit capture hoods suitable for testing up to 4000mm in diameter.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.glp.com.au/2006/01/11/glp-commissions-distributor-test-rig/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
